Restaurant licence in Dubai: 2026 costs, steps and timeline

Start-a-restaurant-in-Dubai

CONTENTS

Connect with our team to start your business !

Dubai’s dining scene is one of the most competitive on earth — and one of the most rewarding for operators who get the fundamentals right. The first fundamental is licensing, and it’s a two-track process that trips up most first-time restaurateurs. Here’s exactly how it works in 2026, what it costs, and the sequencing mistake that turns a 90-day launch into six months.

The two tracks: DET and Dubai Municipality

A Dubai restaurant needs two separate authorisations. Track one is the trade licence from the Department of Economy and Tourism (DET) with the correct F&B activity — restaurant, cafeteria, or restaurant without dine-in for delivery-first concepts. Track two is the Dubai Municipality Food Establishment Permit: kitchen layout approval, HACCP plan, Civil Defence NOC, PIC (Person In Charge) certification, food handler cards, FoodWatch registration and a final on-site inspection. The trade licence makes your company exist; the Municipality permit is what lets you legally serve food.

What it costs in 2026

For a typical mainland restaurant, budget AED 22,000–42,000 for the licensing layer: AED 10,000–30,000 for the DET trade licence depending on activity and legal form, AED 5,000–10,000 for the Municipality food permit, plus trade name reservation (AED 620–2,000), initial approval (AED 100–200), Civil Defence and Ejari. Add alcohol service and the licensing-and-approvals bill climbs to AED 50,000–150,000 — see our separate alcohol licence guide for that layer. None of this includes fit-out or rent, which dwarf the licence fees: a 60-seat dine-in build typically runs well into seven figures all-in.

Step-by-step process

1. Trade name and initial approval (5–7 working days)

Reserve the name, pick the activity code, get DET initial approval so you can sign a lease.

2. Lease, Ejari — and layout approval before you build

Submit kitchen layout drawings to the Municipality’s Food Safety Department before starting fit-out. Layout approval alone takes 10–20 working days, and building an unapproved kitchen is the most expensive mistake in Dubai F&B.

3. Run both tracks in parallel

While fit-out proceeds, complete the DET licence issuance, Civil Defence NOC, HACCP documentation, PIC certification and food handler cards simultaneously. This is the schedule-defining decision: operators who run DET and Municipality tracks in parallel open in 75–95 days from trade name to permit activation; those who run them one after the other routinely take 5–6 months.

4. Final inspection and FoodWatch

Pass the Municipality’s on-site inspection, register the outlet on FoodWatch (free and mandatory), and the Food Establishment Permit activates. You can now serve.

Ongoing compliance

The Dubai Food Code governs daily operations: HACCP-based procedures, at least one certified PIC per shift, valid food handler and occupational health cards for all kitchen staff, an annual contract with a Municipality-approved pest control company, and grease trap maintenance. Municipality inspectors grade outlets and publish results — a poor grade is public.

Mainland or free zone?

A dine-in restaurant serving the local market is a mainland business, full stop. Cloud kitchens and delivery-only brands have slightly more flexibility, but the Municipality permit requirement follows the kitchen’s location either way. If you’re weighing a smaller-format entry into F&B, a cafeteria or tea shop licence is the lighter version of this same process.

How Set Hub de-risks the 90 days

Every week of delay is a week of rent on a kitchen that can’t open. Set Hub’s business support team runs the DET and Municipality tracks in parallel by default, pre-checks layouts before submission, and books inspections the moment fit-out milestones allow. Start with the cost calculator to see your full licensing budget, then let the team pressure-test your unit before you sign the lease.

FAQs

How long does a restaurant licence take in Dubai? 75–95 days is realistic with parallel processing; sequential applicants often take 5–6 months.

What’s the minimum licensing budget? Around AED 22,000–42,000 before fit-out and rent, for a standard mainland restaurant without alcohol.

Can I start with delivery only? Yes — “restaurant without dine-in” activity plus a compliant kitchen. The Municipality permit still applies.

Do I need HACCP from day one? Yes — a HACCP plan is part of the Municipality permit chain, not an after-opening upgrade.

Related reads

Is the dream of a tax-efficient business setup in UAE still a reality in 2026, or has the new regulatory landscape changed the game
Net FDI inflows into Saudi Arabia surged by 53% in 2025, reaching a staggering $32.6 billion as the Kingdom climbed to 13th globally for